Full, mixed or LCL container: how to decide

How much fits in a 20', a 40' and a 40' high cube, when a mixed container makes sense, what LCL really costs you, and how to read freight indices before you place an order.

Español

ON THIS PAGE

  • 1. Three ways to ship
  • 2. 20', 40' and 40' high cube: what fits
  • 3. Mixed containers: more lines, one box
  • 4. When LCL makes sense, and what it adds
  • 5. Balance the container: volume, value and landed cost
  • 6. How to decide on each order
  • 7. Reading freight indices before you order
  • Key takeaways

  • Packed kitchen equipment is bulky for its weight, so in most loads the space runs out before the weight limit. Plan by cubic meters first, then check weight.
  • A mixed container lets you combine several lines in one box when they ship from the same port. You get full-container handling without buying a full container of one product.
  • LCL can cost less for small orders, but each extra handling point adds risk, time and destination charges. Ask for both quotes before you decide.
  • Every order ends in the same question: how will it travel? A full container of one line, a mixed container with several lines, or a few cubic meters inside a consolidated (LCL) container shared with other shippers.

    The answer changes your freight cost per unit, how much stock you carry, and the condition in which the equipment reaches your warehouse. This guide gives you the numbers and the questions to make that call on each order.

    1. Three ways to ship

  • Full container (FCL), one line. The whole container is yours and carries one product family. It is sealed at loading and opened at destination.
  • Mixed container (FCL), several lines. Still a full container booked for you, but loaded with different products, for example refrigeration plus cooking equipment. It is handled like any FCL.
  • Consolidated cargo (LCL). You pay for the space you use inside a container shared with other shippers. The cargo is loaded at a consolidation warehouse at origin and unloaded at a warehouse at destination.
  • 2. 20', 40' and 40' high cube: what fits

    Dry containers carry almost all foodservice equipment. Packed refrigerators and freezers travel in a dry container too; they do not need a refrigerated (reefer) container. The figures below are typical values published by a major carrier and a customs broker. Each container varies by manufacturer, so confirm the unit you get.

  • Volume runs out first. Equipment ships in cartons and wooden crates with air inside, so you fill the space well before the weight limit. Plan with the cubic meters on the packing list (volume per carton times quantity).
  • The usable space is smaller than the volume in the table. Crate shapes, stacking limits and space for loading leave gaps. Never plan a container at 100% of its listed volume.
  • Height matters. The high cube is about 30 cm taller inside and at the door. Tall units such as reach-in refrigerators and display cases can fit or stack better in it.
  • Refrigeration travels upright. The manuals for the refrigeration lines PGP supplies say the cabinet must not tilt more than 45° in transport and must stand for at least 24 hours before it is plugged in. Pass this to your installers.
  • Check road limits at destination. The maximum payload of the container is not always the legal limit for trucks in your country. Heavy loads, such as stainless steel tables and sinks in bulk, can reach local road limits first.
  • 3. Mixed containers: more lines, one box

    Most distributors do not need a full container of a single product. A mixed container lets you order the right quantity of each line and still ship as FCL: one booking, one seal, one set of documents and one delivery.

    The limit is geography. Factories that make each product family are in different regions of China, and a container is loaded at one port. Lines that ship from the same port mix easily. Lines from distant factories usually do not, because bringing them together adds inland trucking, time and handling.

    PGP groups its lines by port of shipment:

  • Qingdao: refrigeration and cooking equipment.
  • Guangzhou: refrigeration, ice machines, catering equipment and ventilation systems.
  • Ningbo or Shanghai: stainless steel fabrication, janitorial products, display cases, shelving and storage.
  • When you plan a mixed container, start with the line you need most and fill the remaining space with lines from the same group. Ask for a load plan before you confirm, so you know how many units of each line fit.

    4. When LCL makes sense, and what it adds

    LCL suits a first test order, an urgent restock of a few units, or spare parts. You share the container cost with other shippers, so a small shipment costs less in total. The cost per unit is usually higher than in a full container.

  • More handling. LCL cargo is loaded at a consolidation warehouse at origin and unloaded again at destination. Each handling point adds risk of damage, loss or delay. Crates and corner protection matter more in LCL.
  • More time. The consolidator waits until the container is full, and the cargo is unloaded and sorted at destination before you can collect it.
  • Billing. LCL is billed by volume, with a weight rule for dense cargo. The volume measured at the warehouse is the one that counts, so make sure your packing list matches the real cartons.
  • Destination charges. Warehouse handling, unloading and documentation charges at destination are billed per shipment and can be a large part of the total on a small order. Ask your forwarder for them in advance.
  • Insurance. Insure the cargo from door to door. Damage claims are harder to trace when several shippers share one container.
  • 5. Balance the container: volume, value and landed cost

    Freight is paid per container, and each unit carries a share of it according to the space it takes. A bulky unit with a low price carries much more freight compared with its value than a compact unit with a higher price. If you fill a container with a few large, low-value units, the freight can eat the margin you planned, above all when rates are at a peak.

  • Simulate the landed cost before you order. For each line, add the FOB price, its share of freight by volume, insurance, duties, destination charges and delivery to your warehouse. Compare the result with the price your market will pay.
  • Balance the mix. Combine bulky lines with compact, higher-value lines so the average freight per unit stays within the cost range you planned.
  • Watch the freight cycle. When rates are high, cut the share of bulky, low-value units, move them to a later container or add higher-value lines from the same port group.
  • Set a cost range per line before you order, and check it again with the freight quote you receive at booking.
  • 6. How to decide on each order

  • Add up the cubic meters from the packing list for everything you want to order.
  • Compare with the containers. If the order is close to a 20' or a 40', look at what else you could add from the same port group to fill it.
  • Ask for two quotes for the same cargo: LCL and the smallest full container that fits. Include origin charges, ocean freight and destination charges in both. The point where FCL becomes cheaper changes by route and season.
  • Count the stock you can carry. A larger order lowers freight per unit but ties up cash and warehouse space. Order what you can sell before the next container arrives.
  • Count the risk. For high-value or fragile equipment, the lower handling of a full container can be worth part of the difference in price.
  • 7. Reading freight indices before you order

    Ocean freight changes every week. Two public indices help you see the direction of the market:

  • Drewry World Container Index (WCI). Published weekly. Spot rates in US dollars per 40' container on eight major East-West routes, such as Shanghai to Los Angeles and Shanghai to New York.
  • Freightos Baltic Index (FBX). Published daily. Spot rates per 40' container on 12 routes, plus a global composite.
  • Neither index tracks China to the Caribbean or Latin America directly. Use them to see whether the market is rising or falling, and watch carrier announcements of general rate increases (GRIs) for your route. The quote from your forwarder for your port is the number that counts.

  • If the indices are rising and carriers announce GRIs, confirm the booking early and ask how long the quote is valid.
  • Before peak seasons and holidays in China, plan production and booking with extra time.
  • PGP NOTE

    PGP supplies factory-direct lines from vetted factories and builds mixed containers by port of shipment, so you can combine several lines in one full container. Every order is inspected before loading. PGP quotes FOB China port or with freight to your destination port, with freight billed at cost.

    Sources

  • Hapag-Lloyd – 40' standard container specifications
  • Hapag-Lloyd – 40' high cube container specifications
  • Hapag-Lloyd – 20' standard container specifications
  • Shapiro – Introduction to ocean container specifications (trade reference)
  • MSIG Insurance – FCL vs LCL: definition and differences (trade reference)
  • Flexport Help Center – How LCL cargo is measured and billed (trade reference)
  • Drewry – World Container Index
  • Baltic Exchange – Freightos Baltic Index (FBX)
  • This guide is general information. Container dimensions and payloads vary by unit and carrier, and road weight limits depend on local law. Freight rates, charges and transit times change often. Confirm them with your freight forwarder or carrier before you order.

    Related guides

    Keep going with the next step.

    IMPORT & LOGISTICS Incoterms for equipment buyers FOB, CFR, CIF and the rest: who pays each cost, where the risk passes to you, and what is still left to pay when the container reaches your port. 7 min read · EN / ES

    Incoterms for equipment buyers

    FOB, CFR, CIF and the rest: who pays each cost, where the risk passes to you, and what is still left to pay when the container reaches your port.

    7 min read · EN / ES

    BUILD YOUR LINE The spec checklist before you order Power, gas, refrigerant, certifications and paperwork: what to define in writing before the factory starts production, so the equipment works in your market from the first day. 7 min read · EN / ES

    BUILD YOUR LINE

    The spec checklist before you order

    Power, gas, refrigerant, certifications and paperwork: what to define in writing before the factory starts production, so the equipment works in your market from the first day.

    How to estimate landed cost

    From factory price to your warehouse: freight, duties, fees and handling.