Resources
Distributor Guides
BUILD YOUR LINE
The spec checklist before you order
Power, gas, refrigerant, certifications and paperwork: what to define in writing before the factory starts production, so the equipment works in your market from the first day.
Español
ON THIS PAGE
1. Electrical: voltage, frequency, phase and plug
2. Gas: type, pressure and orifices
3. Refrigeration: refrigerant, climate and service
4. Certifications and marks
5. Documentation, labels and parts
6. Before you confirm the order
Printable checklist
Key takeaways
Voltage, frequency (50 or 60 Hz), phase and plug type must match the site where the unit will run.
Gas equipment must be set for the gas your customers use, natural gas or LP, with the right orifices and regulator.
Ask for the certification marks your customers and inspectors require, and confirm they cover the exact model you buy.
A factory builds what the purchase order says. If the order leaves out the voltage, the gas type or the plug, the factory uses its default, and the default may not fit your market. Fixing it after the container arrives costs time, parts and sometimes the sale.
This guide lists what to define before you order. Use the checklist at the end with every new model and every new customer.
1. Electrical: voltage, frequency, phase and plug
Electrical supply varies across Latin America and the Caribbean. Most markets run at 60 Hz, but some, such as Chile, Argentina, Uruguay, Jamaica and Barbados, run at 50 Hz. Voltage can also vary within one country and between a home and a commercial building.
Voltage and frequency. Write both in the order, for example 115V/60Hz or 220V/60Hz. Motors and compressors are built for one frequency. The U.S. Department of Commerce notes that a 60 Hz device will not work properly on 50 Hz current even when the voltage is similar.
Phase. Single-phase or three-phase. Large ovens, fryers, dishwashers and remote condensing units are often three-phase.
Plug and cord. State the plug type your customers use, or ask for the unit without a plug if an electrician will hard-wire it.
Check the site. For a large project, ask your customer for the voltage measured at the panel before you confirm the order.
2. Gas: type, pressure and orifices
Natural gas and LP (propane or a propane-butane mix) burn at different pressures. A burner set up for one will not work safely on the other without changing the orifices and, in most cases, the regulator.
Gas type. Write natural gas or LP in the order for every gas unit. In many Caribbean and Central American markets, kitchens run on LP cylinders or tanks. Ask your customer if you are not sure.
Supply pressure. Ask what pressure your customers receive and confirm the unit and regulator are rated for it.
Conversion parts. Ask whether the factory includes a conversion kit for the other gas, and keep spare orifices for the models you sell. Any conversion should be done by a qualified gas technician following the manual.
Local code. Gas installations follow local codes. In the United States, LP-gas installations follow NFPA 58. Check what applies in your country.
3. Refrigeration: refrigerant, climate and service
Many current commercial refrigerators and freezers use R-290 (propane), a flammable hydrocarbon refrigerant. In May 2024 the U.S. EPA finalized SNAP Rule 26, which allows larger R-290 charges in new self-contained commercial units built to the UL 60335-2-89 standard.
Refrigerant. Confirm the refrigerant for each model and check that it is allowed in your market and that local technicians can service it. R-290 work needs technicians trained for flammable refrigerants and the right tools.
Climate. Kitchens in the region are hot and humid. Ask what room temperature and humidity the unit was tested for. For display cases, the ISO 23953-2 standard classifies cabinets by test room conditions.
Configuration. Door hinge side, number of shelves, casters or legs, and self-contained or remote condensing unit.
4. Certifications and marks
Ask which marks your customers, inspectors and health authorities require before you order. Common requests in the region are:
Electrical safety (North America). Marks from a Nationally Recognized Testing Laboratory (NRTL) recognized by OSHA, such as UL, Intertek (ETL Listed) or CSA, show that the product meets North American safety standards.
Sanitation. NSF/ANSI standards set food protection and sanitation criteria. For example, NSF/ANSI 7 covers commercial refrigerators and freezers and NSF/ANSI 4 covers commercial cooking equipment. The NSF mark and the ETL Sanitation mark both certify to these standards.
CE marking (Europe). The manufacturer affixes CE marking to show conformity with EU directives such as the Low Voltage Directive. Some buyers in the region accept it. It is a self-declaration by the manufacturer and is different from a North American listing.
Check the model. A certificate covers specific models and configurations. Ask for the certificate or the listing and confirm that your model, voltage and refrigerant appear on it.
5. Documentation, labels and parts
Nameplate. It should show voltage, frequency, amperage or power, gas type and refrigerant with charge. Inspectors and technicians read it first.
Manuals. Ask for the user and installation manual in the languages your customers read, Spanish and English at least.
Your brand. If you sell under your own brand, confirm the logo, labels, manual cover and box print before production. Guide 2 covers private label.
Parts. Ask for the exploded view and the parts list with part numbers, and decide which wear parts you will keep in stock: gaskets, fan motors, thermostats or controllers, igniters and thermocouples.
6. Before you confirm the order
Compare the proforma invoice line by line with your spec sheet: voltage, frequency, gas, refrigerant, plug, color, options and quantities.
For a new model, ask for photos of a finished unit and its nameplate, or a sample.
Agree on what is checked before loading and how the results reach you.
Printable checklist
PGP NOTE
PGP supplies factory-direct lines from vetted factories and builds each order to the specification you confirm: voltage, frequency, gas type, refrigerant and private label. Every order is inspected before loading, and each line comes with manuals, exploded views and spare parts by part number.
Sources
U.S. International Trade Administration – Electric Current Worldwide
U.S. EPA – SNAP Final Rule 26 fact sheet (May 2024)
ACHR News – EPA finalizes SNAP Rule 26 (trade press)
ANSI – NSF/ANSI 7-2023: Commercial refrigerators and freezers
Intertek – ETL Sanitation mark
Intertek – ETL Listed mark
OSHA – Current list of Nationally Recognized Testing Laboratories
EUR-Lex – Low Voltage Directive 2014/35/EU (summary)
NFPA 58 – Liquefied Petroleum Gas Code
BSI – ISO 23953-2: Refrigerated display cabinets, classification and test conditions
This guide is general information. Electrical, gas and refrigerant requirements depend on local codes and authorities. Confirm them with a licensed technician, your utility or the competent authority in your country.
Related guides
Keep going with the next step.
BUILD YOUR LINE How to build your own equipment brand, step by step Where an own line competes, how the branding process usually runs, and the points to plan before your first container under your name. 8 min read · EN / ES
How to build your own equipment brand, step by step
Where an own line competes, how the branding process usually runs, and the points to plan before your first container under your name.
8 min read · EN / ES
IMPORT & LOGISTICS Incoterms for equipment buyers FOB, CFR, CIF and the rest: who pays each cost, where the risk passes to you, and what is still left to pay when the container reaches your port. 7 min read · EN / ES
IMPORT & LOGISTICS
Incoterms for equipment buyers
FOB, CFR, CIF and the rest: who pays each cost, where the risk passes to you, and what is still left to pay when the container reaches your port.
7 min read · EN / ES
IMPORT & LOGISTICS Full, mixed or LCL container: how to decide How much fits in a 20', a 40' and a 40' high cube, when a mixed container makes sense, what LCL really costs you, and how to read freight indices before you place an order. 6 min read · EN / ES
Full, mixed or LCL container: how to decide
How much fits in a 20', a 40' and a 40' high cube, when a mixed container makes sense, what LCL really costs you, and how to read freight indices before you place an order.
6 min read · EN / ES